Section 2
Questions 11 -14
Choose the correct letter, A, B or C.
11 A survey found people’s main concern about traffic in the area was
A cuts to public transport.
B poor maintenance of roads.
C changes in the type of traffic.
12 Which change will shortly be made to the cycle path next to the river?
A It will be widened.
B It will be extended.
C It will be resurfaced.
13 Plans for a pedestrian crossing have been postponed because
A the Post Office has moved.
B the proposed location is unsafe.
C funding is not available at present.
14 On Station Road, notices have been erected
A telling cyclists not to leave their bikes outside the station ticket office.
B asking motorists to switch off engines when waiting at the level crossing.
C warning pedestrians to leave enough time when crossing the railway line.
Questions 15-20
Label the map below.
Write the correct letter, A-I, next to Questions 15-20.
15 New car park
16 New cricket pitch
17 Children’s playground
18 Skateboard ramp
19 Pavilion
20 Notice board
For this task: Answer Keys :: Tapescript